On the Nistru River, the project focuses on areas located downstream and upstream of the Dniester Hydro-energetic Complex, which includes the hydropower station no. 1 (HPP-1), and Hydro Power Plant No. 2 (HPP2) which were built directly on the Dniester river and Hydroenergetic Station of Accumulation via Pumping (CHAP) which was constructed on the right bank of the Dniester river and which feeds from the buffer reservoir (located between HPP- 1 and HPP-2) and the built-up reservoir on the river bank.The Prut River will focus on the localities of Stânca (Ştefăneşti), Romania and Costeşti from the Republic of Moldova, where the hydroelectric power plant and the reservoir are located.